A traceable landscape scope whose exact site, routes, planting, hardscape, water, maintenance, and open restrictions are accepted or deferred by named responsible and affected people.
Landscape Site Decision Record
Coordinate one authorized landscape change through people, property, utilities, site evidence, approved planting and hardscape sources, bounded quantity scenarios, controlled work, monitoring, and named acceptance.
- • Property, lease, association, insurer, facility, or program records available
- • Urgent falling-tree, electrical, gas, water, flooding, erosion, fire, or access hazards routed safely
- • Work outside property, easement, covenant, utility, water, environmental, or permit authority can harm people, habitat, drainage, services, and neighboring land.
- • A visual redesign can hide mobility, sensory, allergy, heat, child, animal, maintenance, security, or emergency-route needs.
- • One-call markings, surveys, soil maps, hardiness zones, drainage observations, and calculators answer different questions and cannot substitute for one another.
- • Hidden utilities, unstable trees/slopes, contaminated soil, poor drainage, invasive species, runoff, or unsuitable access can materially change the scope.
Choose your path
Built around the job you need to finish
Carry one authorized landscape change from property, people, utilities and site evidence through an approved planting/hardscape/water system, bounded quantities, controlled work, inspection, monitoring and named acceptance.
Property owner or coordinator changing one yard
Improve use, appearance or ecology without losing authority, drainage, services, access, neighbor trust or maintainability.
Resolve owners, affected people, survey/utility/site evidence, approve the complete plan, compare material scenarios and review actual use/maintenance.
Accepts or restricts one exact landscape phase without a generic legal, sustainable, accessible, low-maintenance or thriving claim.
Landscape designer, installer, arborist or reviewer
Keep site, utility, soil, drainage, plant, product, path, irrigation, concealed work and changes traceable.
Version the approved set and sources, reconcile calculators, enforce hold points and retain field/inspection/as-built evidence.
Can reproduce decisions without quantity arithmetic or Project progress becoming design, permit, utility, environmental or installation approval.
Affected route, garden, play, care or maintenance user
Use and maintain the site with workable surfaces, reaches, sensory/heat conditions, support and emergency access.
Review samples and layout, temporary routes, representative circulation/use, care burden, seasonal observations and correction/support paths.
Can accept or reject the handoff with access, exposure, water, maintenance and open-defect conditions visible.
Authoritative checks for this workflow
Outputs and checklists are planning aids. Review the linked current authorities and the records, terms, instructions, and requirements that apply to your exact situation before a consequential decision.
- 811 Day — Call Before You DigU.S. DOT Pipeline and Hazardous Materials Safety Administration · Current federal safe-digging route for every excavation, including small home projects; state one-call timing/process, current markings and exact utility/private-facility evidence still control.
- Web Soil SurveyUSDA Natural Resources Conservation Service · Official soil-planning information whose own boundary requires onsite investigation for some soil-quality, conservation and engineering uses; it is not site clearance or design approval.
- WaterSense OutdoorsU.S. Environmental Protection Agency · Current water-smart landscape route tying design and irrigation to region, plants, soil, weather, water and maintained equipment rather than one universal schedule.
- Water Budget ToolU.S. Environmental Protection Agency · Current landscape water-use comparison tool; EPA explicitly states it is not intended to determine irrigation scheduling and points to current local weather evidence.
- Introduction to Pesticide LabelsU.S. Environmental Protection Agency · Current federal route explaining legally enforceable pesticide label directions and risk controls; the Project cannot create substitute application, exposure, runoff or disposal instructions.
- Outdoor Developed Areas — Accessibility GuideU.S. Access Board · Federal outdoor-developed-area accessibility guidance with explicit facility/land scoping; household coverage is not assumed while actual affected-user routes and use remain evidence requirements.