Bathroom Renovation Guide

Bathroom renovation workflow covering fixture layout, tile and waterproofing calculations, plumbing rough-in planning, and finishing checklists.

homeownersproperty flippersexperienced DIY renovators

Workflow

  1. Plan the Renovation

    1-2 weeks

    Define scope: layout changes, fixture upgrades, tile selection, and ventilation needs. Create a budget and timeline. Decide DIY vs. subcontractor for plumbing and electrical.

  2. Demolition

    1-2 days

    Remove old fixtures, tile, vanity, and flooring. Protect adjacent rooms with plastic sheeting. Inspect subfloor, framing, and plumbing for hidden damage.

  3. Rough Electrical & Ventilation

    1-2 days

    Run wiring for lighting, GFCI outlets, exhaust fan, and heated floor if desired. Install exhaust fan ducted to exterior (not attic).

  4. Waterproof Shower & Wet Areas

    2-3 days

    Install cement board in wet areas, apply waterproof membrane (sheet or liquid) over shower pan and walls to 6 ft height. Flood-test shower pan 24 hours before tiling.

  5. Install Fixtures & Vanity

    1-2 days

    Set toilet (new wax ring), hang vanity and connect plumbing, install shower valve trim, faucet, and accessories. Caulk all tub/shower-to-wall joints with silicone.

  6. Paint, Finish & Final Inspection

    1-2 days

    Paint ceiling and non-tiled walls with bathroom-grade satin or semi-gloss paint. Install mirror, towel bars, and final trim. Schedule plumbing and electrical inspections.

Tools Used

Checklist

0 / 7 completed

Loading your checklist…

Preparation

Waterproofing

Electrical

Ventilation

Finishing

Reference Materials

Tile Quantity & Waste FactorTable

Recommended waste allowances by tile size and layout pattern.

Tile SizeStraight Lay WasteDiagonal/Herringbone WasteThinset (lb/sq ft)
12×12 in10%15%3–4
12×24 in10%15–20%3–4
Subway 3×610%15%2–3
Mosaic sheet15%20%2–3
Large format 24×4815%20–25%4–5
Bathroom Ventilation RequirementsStandard

Minimum exhaust: 1 CFM per sq ft of floor area, or 50 CFM whichever is greater. Duct to exterior (not attic). Run fan 20 minutes after shower use. For bathrooms over 100 sq ft, add 50 CFM per toilet, shower, and tub.

Common Plumbing Pipe SizesTable

Standard residential bathroom pipe sizing for supply and drain.

FixtureSupply LineDrain SizeTrap Size
Toilet3/8 in3 inIntegrated
Vanity sink3/8 in1.5 in1.25 in
Shower1/2 in2 in2 in
Bathtub1/2 in1.5 in1.5 in
Main stackN/A3–4 inN/A
  • Don't Move the Toilet Drain

    Relocating a toilet drain requires breaking concrete or subfloor and is one of the most expensive plumbing changes. Design around existing drain location when possible.

  • Large Format Tile Tips

    Tiles over 15 inches need a 1/2-inch notched trowel and level subfloor. Use a tile leveling system to prevent lippage on large format installations.

  • Order 15% Extra Tile

    Manufacturing dye lots change between orders. Store extra tile in a dry place — you will need it for future repairs or accent additions.

  • Sequence Matters

    Complete rough plumbing and electrical inspections before closing walls. Tile before installing toilet and vanity to protect new fixtures from grout and thinset splatter.

Safety Notes

  • Turn off electricity at the breaker panel before any electrical work in the bathroom — water and electricity are lethal.
  • Wear a N95 respirator when removing old tile, cutting cement board, or mixing thinset to avoid silica dust inhalation.
  • Never tile over existing tile in shower enclosures without verifying the substrate is solid and waterproofing is intact.