Skip to content
Intermediate4-8 weeks

Kitchen Renovation Design

Complete guide for kitchen renovation design — step-by-step workflow, tools, checklist, and expert tips to get started.

renovatorscontractors

Workflow

  1. Map Work Triangle and Appliance Footprints

    1 hour

    Measure existing cabinet runs, locate sink/stove/refrigerator, and document plumbing and electrical rough-in locations for the new layout.

Tools Used

Checklist

0 / 6 completed

Loading your checklist…

Compliance

Planning

Materials

Quality

Safety

Execution

Reference Materials

Kitchen Work Triangle GuidelinesTable

NKBA-inspired distances for efficient kitchen layouts.

LegIdeal RangeMaximum
Sink to range4–9 ft9 ft
Range to fridge4–9 ft9 ft
Fridge to sink4–9 ft9 ft
Total perimeter13–26 ft26 ft
Backsplash Tile FormulaFormula

Tiles needed = (area ft² × 144 ÷ tile area in²) × (1 + waste factor 0.10–0.15).

Counter Task LightingStandard

Food prep areas benefit from 500–750 lux at counter height with 3000–3500K color temperature.

  • Center the Backsplash Focal

    Start tile layout from the range hood centerline so cuts hide in corners rather than above the cooktop.

  • Soft-Close Everything

    Upgrade hinges and drawer slides during install — retrofitting later costs more in labor.

  • Shut Off Utilities

    Verify water, gas, and breakers are off before any demo touching supply lines.

Safety Notes

  • Test paint colors in the actual room with actual lighting before committing.
  • Secure heavy furniture and shelving to walls to prevent tip-overs.