Skip to content
Beginner2-5 days

Seismograph Station Setup

Learn seismograph station setup from scratch with a clear step-by-step workflow, recommended tools, safety guidelines, and expert tips.

citizen seismologistsschool labs

Workflow

  1. Select Quiet Site

    4 hours

    Choose pier on bedrock away from traffic and HVAC vibrations.

  2. Install and Align Sensor

    3 hours

    Level seismometer and align north mark to true north.

  3. Configure Data Acquisition

    2 hours

    Set ≥100 Hz sampling with GPS time sync.

  4. Conduct Noise Survey

    1 day

    Record 24 h background; plot PSD vs NLNM.

Checklist

0 / 5 completed

Loading your checklist…

Planning

Preparation

Safety

Execution

Reference Materials

IRIS StandardsStandard

Publish location, depth, response, and true-north orientation metadata.

NyquistFormula

f_nyquist = sample_rate / 2 — aliasing above Nyquist corrupts analysis.

Sampling RatesTable

Typical settings.

RateUseMax f
50 HzRegional25 Hz
100 HzLocal50 Hz
200 HzStrong motion100 Hz
  • Label in Field

    Label samples immediately with date, GPS coordinates, and habitat notes.

  • Chain of Custody

    Maintain sample integrity from collection through lab analysis.

  • Wildlife Safety

    Know venomous species and territorial animals in your study area.

Safety Notes

  • Team lift for heavy sensors.
  • Secure shelves against earthquake fallback.

Explore related topics