Erosion Control Measures Guide

Learn erosion control measures from scratch with a clear step-by-step workflow, recommended tools, safety guidelines, and expert tips.

conservation crewswatershed stewards

Workflow

  1. Assess Erosion Damage

    3 hours

    Document rills, gullies, braiding, and tread widening with photos and GPS points.

  2. Select Best Management Practices

    2 hours

    Choose check dams, water bars, revegetation, or tread reconstruction based on severity.

  3. Install Control Structures

    2 days

    Build water bars, rock armoring, or log erosion barriers per site plan.

  4. Revegetate Disturbed Areas

    1 day

    Seed and mulch bare soil with native species appropriate to elevation and aspect.

Tools Used

Checklist

0 / 8 completed

Loading your checklist…

Planning

Preparation

Safety

Execution

Quality

Documentation

Reference Materials

Upslope FixesStandard

Erosion control fails if water still enters tread from above — fix source first.

Check Dam SpacingFormula

Space check dams at 1× the gully depth measured bank to bank.

BMP SelectionTable

Erosion treatments by severity.

SeverityTreatmentTimeline
Light rillHand dams1 day
Moderate gullyRock armoring1 week
SevereEngineeredSeason+
  • Native Seed

    Use locally sourced seed mixes to avoid invasive introduction.

  • Monitor Annually

    Structures settle — schedule post-storm inspections.

  • Chemical Erosion Mats

    Some jute nets contain synthetic fiber — verify biodegradable products for wilderness areas.

Safety Notes

  • Watch for rolling rocks when placing check dams in steep gullies.
  • Tick and poison ivy precautions in revegetation zones.