Define the storage service and measurement boundary
State whether storage covers essential loads, smooths a supply profile or supports an independent system. Record required service duration, fallback actions, actual load schedules and simultaneous power needs. Place wind, optional PV and load on one DC-bus basis after their stated conversion paths.