Record the roof, load and project constraints
Collect electricity use by billing period, planned load changes, roof dimensions, orientation, obstructions and roof condition. Obtain the actual structural, access, setback and permitting requirements from the project team. Keep usable array area separate from gross roof area and identify work needed before a PV installation.